Specialty

Our team has extensive experience in multiple specialty markets, including Industrial, Manufacturing, Heavy Restoration, Office TI, and Education. Our history collaborating with clients on their capital repair, improvement, and new construction projects throughout several market sectors provides us with the flexibility to meet any projects’ demands.

Click the images below for information on some of our key specialty projects.

Kuka Demo & Tooling Installation (Ford Motor Company)

Image used under license from Shutterstock.com

HIROSE Electric U.S.A. Headquarters Relocation

Burns Harbor Sleeper Station (Norfolk Southern)

Kuka Demo & Tooling Installation (Ford Motor Company)

Location

Chicago, Illinois

Market

Industrial / Manufacturing 

Project Size

24-acres (site work) / 53,000 square-feet (new construction)

Contract Value

$3,200,000

Description

Vader National Electric joint ventured with Lake Erie Electric to install the electrical equipment and infrastructure for Ford Motor Company’s new Kuka Robotics’ collaborative robots (‘cobots’).  The cobots assist workers, making their tasks safer, easier, and quicker—for example, the robots can lift and precisely align heavy automotive parts, or reach into difficult to access locations during the assembly process. 

With the help of Vader’s prefabrication facility located in Bellwood, IL, the technology-rich project was completed with great speed and accuracy.

HIROSE Electric U.S.A. Headquarters Relocation

Location

Downers Grove, Illinois

Market

Office TI

Project Size

18,500 square-feet

Contract Value

$500,000

Description

Vader was involved in HIROSE U.S.A.’s monumental Headquarters Relocation project from the initial budgeting stage through project completion.  After Schematic Design, it was determined the project was over two times the allocated budget.  Vader worked with the Design Team and General Contractor to complete Value Analysis / Design-Assist on the electrical and lighting scopes of work—the overall design intent was maintained, while reducing cost by over 50%.  Even high-end features, including the golf simulator and technology-rich conference room were left in scope.

The project was successfully completed on-schedule and under budget—strong collaboration during every stage of design, budgeting, and construction resulted in great success.  With construction completed at only $95 per square foot, the client was left with stunning, high-quality office and collaboration spaces at a record-low price.

Burns Harbor Sleeper Station (Norfolk Southern)

Location

Burns Harbor, Indiana

Market

Industrial 

Project Size

30-stories

Contract Value

$1,500,000

Description

Vader completed the electrical construction / excavation for Burns Harbor’s sleeper station.  The industrial capital repair and improvement project will allow Norfolk Southern to complete maintenance on their fleet of freight cars and engines in their Burns Harbor sleeper station for years to come. 

2626 N Lakeview Condominiums—Capital Repair & Improvement Projects

Location

Chicago, Illinois

Market

Heavy Restoration

Project Size

570,000 square-feet

Contract Value

$2,250,000 (cumulative)

Description

Vader was involved in multiple heavy-restoration projects at 2626 N Lakeview Condominiums, including their Garage Restoration, Elevator Modernization, and Plumbing Riser Replacement projects.

The largest and most complex electrical scope was installed during the Elevator Modernization project.  The logistically challenging project included furnishing and installing a new emergency backup generator on the roof of the parking garage.  It also included concrete scanning, coring, and installation of multiple electrical feeders up the entire height of the building—from the basement to the elevator machine room located on the 43rd floor (Penthouse-Level). 

Hinsdale Township High School District 86 Masterplan

Location

Hinsdale, Illinois

Market

 Education 

Project Size

16-stories

Contract Value

$8,200,000 (cumulative)

Description

This multi-year phased project consisted of extensive renovations and additional to both Hinsdale Central and Hinsdale South campuses.  Amongst other improvements, the project consisted of electrical upgrades throughout both campuses, renovations to classrooms, stadium upgrades, cafeteria & bathroom renovations, demolition and replacement of swimming pools, new mechanical systems, and life-safety improvements. 

Barrington Grove SD 220

Location

Barrington, Illinois

Market

Education / Heavy Restoration 

Project Size

16-stories

Contract Value

$1,400,000

Description

The capital improvement project included electrical, technology, security, HVAC, and other infrastructure improvements throughout the elementary school. 

2626 N Lakeview Condominiums—Capital Repair & Improvement Projects

Hinsdale Township High School District 86 Masterplan

Barrington Grove SD 220

2626 N Lakeview Condominiums—Capital Repair & Improvement Projects

Location

Chicago, Illinois

Market

Heavy Restoration

Project Size

570,000 square-feet

Contract Value

$2,250,000 (cumulative)

Description

Vader was involved in multiple heavy-restoration projects at 2626 N Lakeview Condominiums, including their Garage Restoration, Elevator Modernization, and Plumbing Riser Replacement projects.

The largest and most complex electrical scope was installed during the Elevator Modernization project.  The logistically challenging project included furnishing and installing a new emergency backup generator on the roof of the parking garage.  It also included concrete scanning, coring, and installation of multiple electrical feeders up the entire height of the building—from the basement to the elevator machine room located on the 43rd floor (Penthouse-Level). 

Hinsdale Township High School District 86 Masterplan

Location

Hinsdale, Illinois

Market

 Education 

Project Size

16-stories

Contract Value

$8,200,000 (cumulative)

Description

This multi-year phased project consisted of extensive renovations and additional to both Hinsdale Central and Hinsdale South campuses.  Amongst other improvements, the project consisted of electrical upgrades throughout both campuses, renovations to classrooms, stadium upgrades, cafeteria & bathroom renovations, demolition and replacement of swimming pools, new mechanical systems, and life-safety improvements. 

Barrington Grove SD 220

Location

Barrington, Illinois

Market

Education / Heavy Restoration 

Project Size

16-stories

Contract Value

$1,400,000

Description

The capital improvement project included electrical, technology, security, HVAC, and other infrastructure improvements throughout the elementary school. 

Kuka Demo & Tooling Installation (Ford Motor Company)

Image used under license from Shutterstock.com

HIROSE Electric U.S.A. Headquarters Relocation

Burns Harbor Sleeper Station (Norfolk Southern)

Kuka Demo & Tooling Installation (Ford Motor Company)

Location

Chicago, Illinois

Market

Industrial / Manufacturing

Project Size

$3,200,000

Contract Value

$3,200,000

Description

Vader National Electric joint ventured with Lake Erie Electric to install the electrical equipment and infrastructure for Ford Motor Company’s new Kuka Robotics’ collaborative robots (‘cobots’).  The cobots assist workers, making their tasks safer, easier, and quicker—for example, the robots can lift and precisely align heavy automotive parts, or reach into difficult to access locations during the assembly process. 

With the help of Vader’s prefabrication facility located in Bellwood, IL, the technology-rich project was completed with great speed and accuracy.

HIROSE Electric U.S.A. Headquarters Relocation

Location

Downers Grove, Illinois

Market

Office TI

Project Size

18,500 square-feet

Contract Value

$500,000

Description

Vader was involved in HIROSE U.S.A.’s monumental Headquarters Relocation project from the initial budgeting stage through project completion.  After Schematic Design, it was determined the project was over two times the allocated budget.  Vader worked with the Design Team and General Contractor to complete Value Analysis / Design-Assist on the electrical and lighting scopes of work—the overall design intent was maintained, while reducing cost by over 50%.  Even high-end features, including the golf simulator and technology-rich conference room were left in scope.

The project was successfully completed on-schedule and under budget—strong collaboration during every stage of design, budgeting, and construction resulted in great success.  With construction completed at only $95 per square foot, the client was left with stunning, high-quality office and collaboration spaces at a record-low price.

Burns Harbor Sleeper Station (Norfolk Southern)

Location

Burns Harbor, Indiana

Market

 Industrial 

Contract Value

$1,500,000

Description

Vader completed the electrical construction / excavation for Burns Harbor’s sleeper station.  The industrial capital repair and improvement project will allow Norfolk Southern to complete maintenance on their fleet of freight cars and engines in their Burns Harbor sleeper station for years to come. 

2626 N Lakeview Condominiums—Capital Repair & Improvement Projects

Hinsdale Township High School District 86 Masterplan

Barrington Grove SD 220

2626 N Lakeview Condominiums—Capital Repair & Improvement Projects

Location

Chicago, Illinois

Market

Heavy Restoration

Project Size

570,000 square-feet

Contract Value

$2,250,000 (cumulative)

Description

Vader was involved in multiple heavy-restoration projects at 2626 N Lakeview Condominiums, including their Garage Restoration, Elevator Modernization, and Plumbing Riser Replacement projects.

The largest and most complex electrical scope was installed during the Elevator Modernization project.  The logistically challenging project included furnishing and installing a new emergency backup generator on the roof of the parking garage.  It also included concrete scanning, coring, and installation of multiple electrical feeders up the entire height of the building—from the basement to the elevator machine room located on the 43rd floor (Penthouse-Level). 

Hinsdale Township High School District 86 Masterplan

Location

Hinsdale, Illinois

Market

 Education 

Project Size

21-stories

Contract Value

$8,200,000 (cumulative)

Description

This multi-year phased project consisted of extensive renovations and additional to both Hinsdale Central and Hinsdale South campuses.  Amongst other improvements, the project consisted of electrical upgrades throughout both campuses, renovations to classrooms, stadium upgrades, cafeteria & bathroom renovations, demolition and replacement of swimming pools, new mechanical systems, and life-safety improvements. 

Barrington Grove SD 220

Location

Barrington, Illinois

Market

Education / Heavy Restoration 

Project Size

16-stories

Contract Value

$1,400,000

Description

The capital improvement project included electrical, technology, security, HVAC, and other infrastructure improvements throughout the elementary school. 

Kuka Demo & Tooling Installation (Ford Motor Company)

Image used under license from Shutterstock.com

Kuka Demo & Tooling Installation (Ford Motor Company)

Location

Chicago, Illinois

Market

Industrial / Manufacturing 

Project Size

24-acres (site work) / 53,000 square-feet (new construction)

Contract Value

$3,200,000

Description

Vader National Electric joint ventured with Lake Erie Electric to install the electrical equipment and infrastructure for Ford Motor Company’s new Kuka Robotics’ collaborative robots (‘cobots’).  The cobots assist workers, making their tasks safer, easier, and quicker—for example, the robots can lift and precisely align heavy automotive parts, or reach into difficult to access locations during the assembly process. 

With the help of Vader’s prefabrication facility located in Bellwood, IL, the technology-rich project was completed with great speed and accuracy.

HIROSE Electric U.S.A. Headquarters Relocation

HIROSE Electric U.S.A. Headquarters Relocation

Location

Downers Grove, Illinois

Market

Office TI

Project Size

18,500 square-feet

Contract Value

$500,000

Description

Vader was involved in HIROSE U.S.A.’s monumental Headquarters Relocation project from the initial budgeting stage through project completion.  After Schematic Design, it was determined the project was over two times the allocated budget.  Vader worked with the Design Team and General Contractor to complete Value Analysis / Design-Assist on the electrical and lighting scopes of work—the overall design intent was maintained, while reducing cost by over 50%.  Even high-end features, including the golf simulator and technology-rich conference room were left in scope.

The project was successfully completed on-schedule and under budget—strong collaboration during every stage of design, budgeting, and construction resulted in great success.  With construction completed at only $95 per square foot, the client was left with stunning, high-quality office and collaboration spaces at a record-low price.

Burns Harbor Sleeper Station (Norfolk Southern)

Burns Harbor Sleeper Station (Norfolk Southern)

Location

Burns Harbor, Indiana

Market

Industrial 

Project size

$1,500,000

Contract Value

$1,500,000

Description

Vader completed the electrical construction / excavation for Burns Harbor’s sleeper station.  The industrial capital repair and improvement project will allow Norfolk Southern to complete maintenance on their fleet of freight cars and engines in their Burns Harbor sleeper station for years to come. 

2626 N Lakeview Condominiums—Capital Repair & Improvement Projects

2626 N Lakeview Condominiums—Capital Repair & Improvement Projects

Location

Chicago, Illinois

Market

Heavy Restoration

Project size

570,000 square-feet

Contract Value

$2,250,000 (cumulative)

Description

Vader was involved in multiple heavy-restoration projects at 2626 N Lakeview Condominiums, including their Garage Restoration, Elevator Modernization, and Plumbing Riser Replacement projects.

The largest and most complex electrical scope was installed during the Elevator Modernization project.  The logistically challenging project included furnishing and installing a new emergency backup generator on the roof of the parking garage.  It also included concrete scanning, coring, and installation of multiple electrical feeders up the entire height of the building—from the basement to the elevator machine room located on the 43rd floor (Penthouse-Level). 

Hinsdale Township High School District 86 Masterplan

Hinsdale Township High School District 86 Masterplan

Location

Hinsdale, Illinois

Market

Education

Project size

$8,200,000 (cumulative)

Contract Value

$8,200,000 (cumulative)

Description

This multi-year phased project consisted of extensive renovations and additional to both Hinsdale Central and Hinsdale South campuses.  Amongst other improvements, the project consisted of electrical upgrades throughout both campuses, renovations to classrooms, stadium upgrades, cafeteria & bathroom renovations, demolition and replacement of swimming pools, new mechanical systems, and life-safety improvements. 

Barrington Grove SD 220

Barrington Grove SD 220

Location

Barrington, Illinois

Market

Education / Heavy Restoration 

Project size

$1,400,000

Contract Value

$1,400,000

Description

The capital improvement project included electrical, technology, security, HVAC, and other infrastructure improvements throughout the elementary school.